General Electric Parts Distribution Center |
Project Size: |
532,400 Square Feet, 40' Clear Height |
Contract Amount: |
$10,500,098 |
Finish: |
Precast Concrete |
Owner: |
First Industrial Realty Trust, Inc. |
Architect: |
Kovert Hawkins |
|
Constructed as a single tenant, build-to-suit project, this facility included some very special features. The ESFR (early suppression fast-response) fire sprinkler system carries a 90-pound head pressure – never before installed in the Louisville region. With a 40-foot clear height, it is among the tallest interior spaces, setting a new standard for distribution centers. The 44' x 44' bays were constructed utilizing conventional steel frame construction with eight-inch insulated precast concrete panels. |
|